Package
C |
On
site Chemical cleaning servicing : (Hisaka specialist,
+ at least 1 additional man-power required)
-
Dismantling the tightening bolts from the PHE
-
Removal of plates from the PHE
-
Removal of old gaskets from the plates
-
Chemical soaking of plates
-
Water rinsing/ high pressure water jetting/ manual
cleaning of plates
-
Regasketting of new/old gaskets onto the plates
-
Repair of minor deformed plates
-
Visual inspection of plates & gaskets
- Assemble back the plates as per original drawing
-
Tightening of PHE back to original tightening length
as per original drawing
-
Neutralise the used chemical before it is drained
at customer drain point
-
Online / on site testing of PHE to ensure no leakages
-
Full servicing report will be provided
|
|
|
Package
D |
Chemical
cleaning servicing (send to Hisaka Service Center)
-
Pre-test of received PHE to identify leak point
(if any)
-
Dismantling the tightening bolts from the PHE
-
Removal of plates from the PHE
-
Removal of old gaskets from the plates
-
Chemical soaking of plates
-
High pressure water jetting cleaning of plates
- Dye-penetration
testing to identify cracks, pin-hole (if any)
-
Repair of minor deformed plates
-
Regasketting of new/old gaskets onto the plates
-
Visual inspection of plates & gaskets
-
Assemble back the plates as per original drawing
-
Tightening of PHE back to original tightening length
as per original drawing
-
Online / on site testing of PHE to ensure no leakages
-
Full servicing report will be provided
|
|
|
Package
E |
CIP
servicing (Hisaka specialist, at least 1 additional
man-power required)
-
To provide CIP cleaning service on site
-
Before starting of CIP, customer to disconnect all
inlet & outlet nozzle connections
-
Hisaka to provide own chemical and CIP unit
-
After completion of CIP, Hisaka will bring back effluent
generated from PHE
-
Water supplied into the PHE for flushing propose to
be disposed to customer drain point after it is neutralised
-
Online / on site testing of PHE to ensure no leakages
-
Full servicing report will be provided
|
|
**For
On-site servicing, if intermixing is found dye-penetration testing
to identify problem plate is provided. |